Before set construction begins, the scenic designer and stage manager translate the ground plan onto the rehearsal room floor and verify that every audience seat can see the action.
Four stage configurations
Proscenium (end-on): Audience faces one side through a picture-frame arch; tall flats and drops go upstage, while masking legs hide the left and right wings.
Thrust (three-sided): The stage projects into the house with audience on three sides. Tall scenery must stay against the back wall so downstage furniture never blocks side-seat views.
Arena (in-the-round): Audience surrounds all four sides. Actors enter through corner aisles (vomitories or “voms”), and only low furniture, platforms, or overhead flown pieces can be used.
Black box: A flexible room where risers and playing areas are rearranged for each production.
Sightlines, masking, and crossovers
Draw an imaginary line from the extreme front-left and front-right audience seats past the proscenium arch and masking legs. Anything inside that wedge is visible to the audience.
In a musical with a 20-person chorus, reserve at least 36 to 48 inches for an unobstructed upstage crossover behind the cyclorama or traveler curtain, and keep offstage prop tables and quick-change booths tucked safely behind the masking legs.
Taping the floor (spike marks)
In week one of rehearsal, the stage management team measures from the centerline and plaster line (back of the proscenium wall) to tape the full-size ground plan onto the rehearsal floor.
During tech week on stage, small L- or T-shaped pieces of cloth spike tape mark where rolling wagons and furniture lock in each scene—using one tape color per act or scene (plus phosphorescent glow tape on black step edges and offstage hazards).